Manufacturing inspections and audits, without the clipboard.
For plant managers, EHS managers, quality engineers and supervisors in discrete and process manufacturing. Run safety, quality and maintenance checks on the shop floor from your phone, catch problems before an OSHA inspector, customer or registrar does, and keep the records to prove it.
Free Plant Manager Daily Checklist · 38 questions · works offline
One inspection program. Three sets of requirements.
Whatever you make, from a single job shop to a multi-line plant or a network of contract manufacturers, you answer to regulators, to your customers and registrars, and to your own quality and safety standards at the same time. Each demands verification and records.
Requirements in
OSHA general industry standards (29 CFR 1910): machine guarding, lockout/tagout, powered industrial trucks, hazard communication and walking-working surfaces, plus injury and illness recordkeeping (29 CFR 1904). EPA and state environmental rules, including hazardous waste generator requirements (40 CFR Part 262) and air and water permits.
EU regulations apply directly in every member state: the Machinery Regulation (EU) 2023/1230 (from 20 January 2027, replacing the Machinery Directive) for machines you build or buy, and REACH and CLP for chemicals. Workplace safety comes from directives transposed into national law, chiefly the Framework Directive 89/391/EEC, the Work Equipment Directive and the ATEX workplace directive, while large installations need a permit under the Industrial Emissions Directive. National labour inspectorates, market surveillance authorities and environmental agencies inspect; fire codes are national.
ISO 9001, ISO 14001 and ISO 45001 certification audited by accredited registrars, plus sector schemes such as IATF 16949 for automotive and AS9100 for aerospace. Customer supplier audits, PPAP and first-article requirements, and social compliance audits such as SMETA.
Your own control plans, work instructions, layered process audits, preventive maintenance programs, 5S and continuous improvement standards, and sustainability commitments.
Electronic inspections & audits
The verification layer that proves every requirement is met, every line, every shift.
- Pre-shift machine, guarding and forklift checks
- First-article, in-process and final quality inspections
- Layered process audits and 5S walks
- Lockout/tagout, hot work and preventive maintenance checks
- Internal, supplier and pre-certification audits
- Every failed item becomes a corrective action with an owner and due date
Drives into your operation
- Records ready for OSHA, EPA, customers and certification auditors
- Nonconformance and defect trends by plant, line, shift and supplier
- Corrective action status and time to close
- Supplier scorecards and certification audit readiness
The rules your checklists should cover
| Standard | What it covers | Who enforces or requires it | SimplChek checklists |
|---|---|---|---|
| United States OSHA Machinery and Machine Guarding (29 CFR 1910 Subpart O) | Guards at points of operation, nip points and rotating parts; specific rules for presses, saws and grinders | OSHA, or your state OSHA plan | |
| United States OSHA Control of Hazardous Energy (Lockout/Tagout) (29 CFR 1910.147) | Written energy control procedures, lockout and tagout devices, training and a periodic inspection of each procedure at least yearly | OSHA | |
| United States OSHA Powered Industrial Trucks (29 CFR 1910.178) | Forklift operator training and evaluation, and examination of each truck before use, at least daily | OSHA | |
| United States OSHA Hazard Communication (29 CFR 1910.1200) | Written program, container labels, safety data sheets and employee training for hazardous chemicals | OSHA | |
| United States EPA Hazardous Waste Generator Standards (40 CFR Part 262) | Waste determination, container management and labeling, accumulation time limits, weekly inspections of accumulation areas, manifests | EPA and authorized state environmental agencies | |
| European Union Machinery Regulation (EU) 2023/1230 | CE marking, EU declaration of conformity, technical documentation and instructions for machinery and related products; applies from 20 January 2027, when it replaces Machinery Directive 2006/42/EC (machines placed on the market until then follow the Directive). | National market surveillance authorities in each member state | |
| European Union Work Equipment Directive 2009/104/EC | Guards and isolation from every energy source on work equipment, inspection by a competent person after installation, periodically and after exceptional events, and records of the results. | National law in each member state (e.g. Germany: Betriebssicherheitsverordnung, BetrSichV); national labour inspectorates | |
| European Union OSH Framework Directive 89/391/EEC | A written assessment of the risks to safety and health, preventive measures that follow from it, worker information and training, and cooperation between employers sharing a site. | National law in each member state (e.g. Germany: ArbSchG; France: Code du travail); national labour inspectorates | |
| European Union REACH (EC) No 1907/2006 and CLP (EC) No 1272/2008 | Safety data sheets supplied and kept current for hazardous substances and mixtures, and hazard labels and pictograms on containers. | National REACH and CLP enforcement authorities in each member state | |
| European Union ATEX Workplace Directive 1999/92/EC | Classification of areas where explosive atmospheres from gases, vapours or dusts can occur into zones, suitable equipment in each zone, and an up-to-date explosion protection document. | National law in each member state; national labour inspectorates | |
| European Union Waste Framework Directive 2008/98/EC | Hazardous waste kept separate, packaged and labelled during storage and collection, with a chronological record of the quantity, nature, origin and destination of the waste. | National law in each member state; national and regional environmental agencies | |
| International ISO 9001 (2026 edition) | Quality management system requirements: context and risk, operational control, supplier control, internal audit, corrective action | Customers who require certification; audited by accredited certification bodies | |
| International ISO 14001 and ISO 45001 | Environmental management (ISO 14001) and occupational health and safety management (ISO 45001) system requirements | Customers and corporate policy; audited by accredited certification bodies |
Library checklists open with a free SimplChek registration. United States and international rules shown. Last reviewed 3 October 2026. This page is general guidance, not legal advice; check your state OSHA plan and environmental permit requirements.
Library checklists open with a free SimplChek registration. European Union and international rules shown. Last reviewed 18 October 2026. This page is general guidance, not legal advice; national laws implementing EU directives can add requirements.
What to check, and how often
A typical rhythm for a manufacturing plant. Each item maps to a ready-made SimplChek checklist.
Daily
- Plant manager floor walk
- Forklift examination before use
- Machine guards in place and working
- First-piece and in-process quality checks
- Housekeeping and walkways clear
Weekly
- Layered process audits
- Hazardous waste accumulation area inspection
- Preventive maintenance tasks signed off
- 5S audit
Monthly
- Full EHS walk-through
- Fire extinguisher visual inspection
- Calibration status of gauges and instruments
- Hot work permit and contractor review
- Supplier quality performance review
Yearly
- Periodic inspection of each lockout/tagout procedure
- Internal audit of the quality, environmental and safety management systems
- Management review
- Certification or surveillance audit (ISO 9001, ISO 14001, ISO 45001)
- OSHA 300A summary posted 1 February to 30 April (most employers with more than 10 employees)
Popular manufacturing checklists
Ready to use in the SimplChek app. Customize any of them, or build your own.
Plant Manager Daily Checklist
38 questions for the plant manager's daily floor walk: safety, housekeeping, equipment condition, production status, quality and staffing. Download it as a PDF, and it is also ready to run in the SimplChek app.
Bring your own checklists. We'll set them up.
Start from the library, build in the app, or hand us what you already use. During your free trial our team turns your paper or spreadsheet checklist into a SimplChek checklist at no charge.
Start free trial- Start your free trial14 days, no credit card.
- Send us your checklistPaper, Word, Excel or PDF. Upload it in the app or email it.
- Inspect on your phoneWe set it up, you run it, offline or online, with photos and notes.
Manufacturing inspection questions
What are the most common OSHA findings in manufacturing plants?
OSHA's most frequently cited general industry standards regularly include hazard communication, lockout/tagout, powered industrial trucks and machine guarding. Regular self-inspections against these rules catch most of the issues an inspector looks for.
How often do forklifts have to be inspected?
OSHA requires each powered industrial truck to be examined before being placed in service, at least daily, or after each shift where trucks run around the clock (29 CFR 1910.178). Operators also need a performance evaluation at least every three years.
How often must lockout/tagout procedures be inspected?
OSHA requires a periodic inspection of each energy control procedure at least once a year, done by an authorized employee other than the ones using it (29 CFR 1910.147). The inspection must be certified with the date, equipment, employees and inspector.
What is a layered process audit?
A layered process audit is a short, frequent check of how a process is being run, done by people at several levels of the organization, from supervisors to plant management. It is widely used in automotive manufacturing and is expected by many customers that require IATF 16949.
Can I run an inspection on a shop floor with no signal?
Yes. SimplChek works fully offline, inside a metal building, cold store or basement, and syncs your inspection, photos and notes when the connection returns.
Can SimplChek use the checklists I already have?
Yes. Send us your current paper, Word or Excel checklist during your free trial and our team will set it up in SimplChek for you.
Running many plants, lines or contract manufacturers? SimplChek connects to the simplcubed Quality Command Center.
Put your clipboard down for good.
Start inspecting with SimplChek today — free for 14 days.